ROIasi, Romania33 days left
Construction supervision for rail signalling upgrade in Iasi and Galati regions, Romania
The buyer wants consultancy and supervision of construction and installation works for a railway signalling upgrade (Lot 4). The supervisor checks works awarded under a separate contract, and acts within the works contract terms. Covers stations on the Vaslui-Iasi, Barlad-Vaslui, Tecuci-Barlad, Vaslui-Botosani and Barlad-Piatra Neamt lines. Duration is 85.5 months, including 2 months pre-construction, 21 months supervision, 60 months warranty, and 2.5 months closing.
Architecture, engineering and surveyingBuyer C.N.C.F. "C.F.R." S.A.-SUCURSALA REGIONALA C.F. IASI-UNITATE…Value 15.8M RONDeadline 2026-12-09