ROBucuresti, Romania29 days left
Gas pipeline connection works for CET Vest power plant in Bucharest, Romania
The buyer, Electrocentrale Bucuresti, wants a contractor to connect the CET Vest power plant to the Transgaz national gas transmission network. The contractor is an EPC contractor, so it handles design, permits, land rights, construction, supply and installation of equipment, connection to existing systems, testing, staff training and support during the warranty period. Single lot, open procedure.
Construction worksBuyer Electrocentrale Bucuresti S.A.Value 50.2M RONDeadline 2026-12-03