Public buyer

Electrocentrale Bucuresti S.A.

Bucuresti, Romania

1open tenders now
1contracts awarded (12 months)
1.0tenders per contract, on average
1contracts ending within 2 years
Building materials and structureswhat it buys most often

Open tenders

ROBucuresti, Romania29 days left

Gas pipeline connection works for CET Vest power plant in Bucharest, Romania

The buyer, Electrocentrale Bucuresti, wants a contractor to connect the CET Vest power plant to the Transgaz national gas transmission network. The contractor is an EPC contractor, so it handles design, permits, land rights, construction, supply and installation of equipment, connection to existing systems, testing, staff training and support during the warranty period. Single lot, open procedure.

Construction worksBuyer Electrocentrale Bucuresti S.A.Value 50.2M RONDeadline 2026-12-03

Contracts ending soon

These usually come back as new tenders a few months before they end.

EndsWhatHeld byValueLength
2027-04-13RO Rock saltMITPAM TRANS2.4M RON6 monthsTED

Who won before

PublishedWhatWon byValueTenders
2026-10-15RO Rock saltMITPAM TRANS2.4M RON1TED