Design and reconstruction of a road bridge over Timisul Sec stream in Brasov, Romania
The buyer wants a contractor to design and rebuild a road bridge over the Timisul Sec stream and the railway track group at Triaj, on Strada Timisul Sec in Brasov. The work follows an approved technical solution. The scope covers design documents, bridge reconstruction works, and the designer's technical assistance during construction. Design takes 3 months; construction takes 20 months, with designer support during that time.