ROBucuresti, Romania32 days left
Feasibility study and environmental assessment for a metro extension in Bucharest, Romania
The buyer, Sector 2 of Bucharest, wants a consultant to prepare a feasibility study, environmental impact assessment and strategic environmental assessment for a metro extension. The extension runs about 2 km from the M2 line at Pipera to Petricani station, with 2 stations to be located by the studies. Work runs in phases: start report, options analysis, preliminary design with feasibility study, and support for expropriation, funding and tendering. Duration is 26 months, with possible technical support afterwards.
Architecture, engineering and surveyingBuyer Sectorul 2 al Municipiului BucurestiValue 6.1M RONDeadline 2026-12-08