ROMarculesti, Romania30 days left
The buyer, an inter-municipal development association, wants a contractor for design and construction works. The project sets up an intelligent natural gas distribution system in Marculesti, Gheorghe Lazar, Scanteia, Cosambesti, Bucu and Valea Ciorii, in Ialomita County. Scope includes the detailed technical design and execution details, technical supervision by the designer during works, and all construction works in the feasibility study. It is one lot.
ROGiurgiu, Romania14 days left
The buyer, APA SERVICE SA, wants a contractor to design, build and provide technical assistance for a wastewater treatment plant at Cosoba, Giurgiu, Romania. The designer must support the works during construction. The work follows the tender specifications. It is a single lot, awarded through an open procedure.
ROBuftea, Romania18 days left
The buyer wants a contractor to design and build a new transport depot in Buftea, Ilfov County. Scope includes an administrative building, a repair workshop with car wash and inspection station, and a bus parking canopy. Works also cover paved areas, 24 parking spaces, fencing, and a rooftop solar system of at least 146.25 kWp. Ten overnight bus chargers, two 22 kW car chargers and an energy audit are included. Duration: 18 months (3 months design, 15 months construction).
ROBucuresti, RomaniaNo deadline given
The buyer, the Romanian Ministry of Defence (military unit 02547), wants design and construction works for a real estate investment at barracks 3015 in Bucharest. The works cover construction and installations, so the General Staff of Defence can carry out its tasks safely. The work must follow national law and Ministry of Defence rules. The procedure is restricted and the notice is in Romanian.
ROBrasov, Romania21 days left
The buyer wants a contractor to design and rebuild a road bridge over the Timisul Sec stream and the railway track group at Triaj, on Strada Timisul Sec in Brasov. The work follows an approved technical solution. The scope covers design documents, bridge reconstruction works, and the designer's technical assistance during construction. Design takes 3 months; construction takes 20 months, with designer support during that time.