FRPau, France21 days left
The buyer wants preventive and corrective maintenance of heating, ventilation and air-conditioning (CVC) installations, covering levels 1 to 5, at two hospitals: CH Orthez and CH Mauléon. The contract is split into two lots, one per hospital, and each lot will be awarded separately. It is a composite framework agreement with a standing contract part and a call-off part.
ESValencia, Spain35 days left
The buyer, the Universitat Politècnica de València, wants a contractor to operate, maintain and manage the energy of its thermal installations across its Valencia campuses. Scope covers air conditioning and ventilation, heating, hot water systems up to the taps and showers, solar thermal systems, central control systems, and heating and hot water pipework in tunnels. Work includes preventive and corrective maintenance and legal compliance.
HRGrad Zagreb, Croatia24 days left
The buyer, HEP d.d., wants a supplier to upgrade and maintain its SAP system used for electricity supply activities at HEP Elektra. The contract has two lots: maintenance of the SAP system, and upgrades and adaptations of the SAP system. The buyer plans one framework agreement with one economic operator for each lot, lasting 24 months.
FRFleury les Aubrais, France28 days left
The buyer, the SDIS 45 fire and rescue service in Loiret, wants a framework agreement for ten-year maintenance of its METZ/ROSENBAUER aerial ladders. Scope includes corrective and preventive maintenance, manufacturer software settings, six-monthly and annual safety inspections, and spare parts (excluding chassis). Work is done at the contractor's workshop or the fire station. Three lots apply. The contractor must allow for changes in the fleet size.
ROAlba Iulia, Romania30 days left
The buyer, a county emergency hospital, wants framework agreements for repair and maintenance of medical equipment. The tender has 43 lots, including pathology department equipment (7 lots) and laboratory analysis equipment (3 lots shown in the lot list). The contract runs for 24 months. Full scope is set out in the specifications.