ROBucuresti, RomaniaNo deadline given
The buyer, the Romanian Ministry of Defence (military unit 02547), wants design and construction works for a real estate investment at barracks 3015 in Bucharest. The works cover construction and installations, so the General Staff of Defence can carry out its tasks safely. The work must follow national law and Ministry of Defence rules. The procedure is restricted and the notice is in Romanian.
ROCluj-Napoca, Romania30 days left
The buyer, Cluj County Council, wants construction works to extend, modernise and equip the outpatient clinic of the Leon Daniello Clinical Hospital of Pneumophthisiology in Cluj-Napoca. The works include demolishing an existing laundry building, constructing a new three-storey building with a basement, linking it to pavilion 2, and site landscaping. The new building will house a laundry, staff changing rooms, medical imaging, consultation rooms and treatment rooms. Utility networks, parking and planting of 11 trees are included. Single lot. Funded under a national health screening programme.
ROOradea, Romania24 days left
The buyer, the county emergency clinical hospital in Bihor, wants construction works for the development and operation of a mental health centre within its new medical infrastructure in Oradea. This is an open procedure for works. The notice gives one default lot and no further scope details.
ROBuftea, Romania18 days left
The buyer wants a contractor to design and build a new transport depot in Buftea, Ilfov County. Scope includes an administrative building, a repair workshop with car wash and inspection station, and a bus parking canopy. Works also cover paved areas, 24 parking spaces, fencing, and a rooftop solar system of at least 146.25 kWp. Ten overnight bus chargers, two 22 kW car chargers and an energy audit are included. Duration: 18 months (3 months design, 15 months construction).
ROBucuresti, Romania7 days left
The buyer wants design and construction works to strengthen and rehabilitate the Victoria Overpass in Bucharest. The bridge needs repairs to meet current safety and strength standards. Main problems are water leaking through joints and damaged waterproofing. The contract covers design, works, and technical assistance from the designer. It is a single lot.