ROBrasov, Romania21 days left
The buyer wants a contractor to design and rebuild a road bridge over the Timisul Sec stream and the railway track group at Triaj, on Strada Timisul Sec in Brasov. The work follows an approved technical solution. The scope covers design documents, bridge reconstruction works, and the designer's technical assistance during construction. Design takes 3 months; construction takes 20 months, with designer support during that time.
ROBucuresti, Romania7 days left
The buyer wants design and construction works to strengthen and rehabilitate the Victoria Overpass in Bucharest. The bridge needs repairs to meet current safety and strength standards. Main problems are water leaking through joints and damaged waterproofing. The contract covers design, works, and technical assistance from the designer. It is a single lot.
ROCluj-Napoca, Romania30 days left
The buyer, Cluj County Council, wants construction works to extend, modernise and equip the outpatient clinic of the Leon Daniello Clinical Hospital of Pneumophthisiology in Cluj-Napoca. The works include demolishing an existing laundry building, constructing a new three-storey building with a basement, linking it to pavilion 2, and site landscaping. The new building will house a laundry, staff changing rooms, medical imaging, consultation rooms and treatment rooms. Utility networks, parking and planting of 11 trees are included. Single lot. Funded under a national health screening programme.
ROGiurgiu, Romania14 days left
The buyer, APA SERVICE SA, wants a contractor to design, build and provide technical assistance for a wastewater treatment plant at Cosoba, Giurgiu, Romania. The designer must support the works during construction. The work follows the tender specifications. It is a single lot, awarded through an open procedure.
ROBuftea, Romania18 days left
The buyer wants a contractor to design and build a new transport depot in Buftea, Ilfov County. Scope includes an administrative building, a repair workshop with car wash and inspection station, and a bus parking canopy. Works also cover paved areas, 24 parking spaces, fencing, and a rooftop solar system of at least 146.25 kWp. Ten overnight bus chargers, two 22 kW car chargers and an energy audit are included. Duration: 18 months (3 months design, 15 months construction).