ROIasi, Romania32 days left
The buyer wants a feasibility study for the planned Harlau city bypass road in Iasi County. The route runs from the south to the north of Harlau, meeting national road DN28B at both ends. The road is planned as a 12 m carriageway with two 3.5 m lanes, and junctions will be roundabouts. The work covers study stages 1 to 5, plus technical support for approval of the study and its economic indicators (stage 6). One lot.
ROTargu Mures, Romania9 days left
The buyer, a natural gas company's Targu Mures branch, wants services to recreate lost or damaged technical documentation for pressure vessels. The documents are needed so a contractor can carry out VTU I/E inspection and extend the remaining service life of the vessels. Some documents were damaged beyond recovery or are missing. Single lot. Open procedure.
ROCluj-Napoca, Romania49 days left
The buyer, the Cluj regional branch of Romania's national railway company CNCF CFR, wants feasibility studies for electrifying six railway sections. The work is split into three lots: Arad–Oradea with Boiu Bihor, Oradea–Carei–Satu Mare, and Satu Mare–Baia Mare–Jibou–Dej. The contract is subject to a suspensive clause tied to funding approval.
ESMadrid, Spain42 days left
The buyer, Administrador de Infraestructuras Ferroviarias, wants a framework agreement for technical assistance during level-crossing removal works. The work covers quality control (quantitative, qualitative and geometric) and safety testing while the works are carried out. The notice describes a single lot. The buyer is based in Madrid, Spain.
ESPamplona, Spain30 days left
The Government of Navarra wants technical health and safety support for its public works and infrastructure projects, run by its Directorate General for Public Works and Infrastructure. The contract covers projects and works from 2027 to 2032. It is split into three lots, each for a safety and health coordinator.