CZPraha, Czechia6 days left
The buyer wants design documentation to obtain a building permit for the Radlická radial road project (Smíchov, section between Bucharova and Jinonice interchanges) in Prague. The work includes securing the related engineering activities, an environmental impact assessment under Czech law 100/2001 Sb. (covering the Bucharova to Zlíchov interchange section), and a detailed geotechnical survey.
ROBucuresti, Romania20 days left
The buyer, the national road infrastructure company in Bucharest, wants a firm to supervise the design and construction of the DN71 road upgrade between Baldana, Targoviste and Sinaia. The work covers widening to four lanes on km 0+000 to km 44+130 and building a two-lane road on km 51+041 to km 109+905. Supervision runs through design and works, and into the warranty period. The contract includes an option for similar follow-on services.
ROIasi, Romania31 days left
The buyer wants a feasibility study for the planned Harlau city bypass road in Iasi County. The route runs from the south to the north of Harlau, meeting national road DN28B at both ends. The road is planned as a 12 m carriageway with two 3.5 m lanes, and junctions will be roundabouts. The work covers study stages 1 to 5, plus technical support for approval of the study and its economic indicators (stage 6). One lot.
SEBorlänge, Sweden40 days left
The buyer, Trafikverket, wants a consultant to prepare a road plan (vägplan) for converting an existing road on route 35 between Åtvidaberg and Rösten into a 2+1 road with a central barrier. The scope covers about 11 km, including 2 wildlife bridges and 4 pedestrian and cycle path gates. The contract is a services contract awarded by open procedure. It is a single lot.
CZPraha, Czechia10 days left
The Road and Motorway Directorate of the Czech Republic wants a framework agreement for geotechnical survey services on small road construction projects. Work is ordered as individual call-offs from framework participants. Each call-off covers preliminary, detailed or supplementary ground surveys, ending in a final survey report prepared under TP76 by a responsible specialist.