FRBayonne, France28 days left
The town of Bayonne wants contractors for works-based upkeep of its green spaces. The work is split into four lots, each awarded separately: right bank green spaces, left bank green spaces, car park green spaces, and tree pruning. Bidders can apply for one or more lots.
FRSaint-Denis, FranceNo deadline given
SNCF Réseau wants telecom works on the rail network in Saint-Denis, France, split into six regional lots: PACA, Languedoc-Roussillon, Rhône, Alpes, Auvergne Nivernais and Bourgogne-Franche-Comté. Work covers station and track telecom equipment, cabling, fibre, earthing and small civil works. Multi-award framework with purchase orders, no minimum volume. Two suppliers per lot. Firm 2 years, plus an optional 1-year extension.
FRMorangis, France24 days left
The town of Morangis wants a contractor to build a multi-activity complex and an urban forest. The work is split into six lots, and each lot will be awarded separately. Lots cover site clean-up and roadworks, structural and building envelope work, interior fit-out, heating, ventilation and geothermal systems, electrical work, and landscaping. Prices are fixed lump sums.
FRChâteauneuf sur Loire, France36 days left
The buyer wants road maintenance works in the Châteauneuf-sur-Loire area, France, under a framework agreement. Work is ordered through purchase orders. Each lot is awarded separately and paid by unit prices. Lots cover road repairs, sprayed asphalt, materials supply, verge clearing and ditch cleaning, road markings and signs, mowing and brushwood clearing (north and south areas), and tree felling and pruning.
FRLyon, France6 days left
The Département du Rhône wants a framework agreement for surface dressing (enduits superficiels) and cold-laid bituminous materials (MBCF) on its departmental road network. Work is ordered through purchase orders at unit prices. Two lots are awarded separately: surface dressing, and cold-laid bituminous materials. The framework may occasionally cover non-road departmental land, such as car parks. All work must be done in daylight only.