SEKungsbacka, Sweden29 days left
EKSTA Bostads AB wants framework agreements for servicing, fault-finding, repair, installation and replacement of white goods across its property portfolio in Kungsbacka. Work covers homes, business premises and shared laundry rooms. The tender has two lots: wet appliances (lot 1) and dry appliances (lot 2). You may bid for one or both. The buyer plans to appoint two suppliers per lot.
NOHorten, Norway34 days left
The buyer wants electrical contractors under a framework agreement. Scope includes service, operation and maintenance of all electrical installations, including low-voltage systems such as ICT, network, fire and other alarms. Also troubleshooting, control and inspections, engineering design, contract projects under NS 8407, cabling and networks, and other additional services. Two zones: Zone 1 covers Buskerud, Numedal, Gol and Ål; Zone 2 covers other areas of Buskerud. Volumes are uncertain and may rise or fall.
ESPalma de Mallorca, Spain34 days left
The buyer, the Balearic Ports Authority, wants comprehensive maintenance of its motorised gates at the port of Eivissa (Ibiza), Spain. This is a single lot covering automatic gate maintenance work at the port. It is an open procedure for services.
ESElche, Spain24 days left
The buyer, Elche City Council in Spain, wants periodic inspections of the electrical installations in public municipal buildings listed in Annex I of the technical specifications. The work includes a detailed report on the low-voltage systems and any changes needed under Spanish rules (Royal Decree 842/2002, ITC-BT-28 and ITC-BT-29). The winner must also fix and correct the defects found during inspections. This is a single lot.
HRGrad Zagreb, Croatia24 days left
The buyer, HEP d.d., wants a supplier to upgrade and maintain its SAP system used for electricity distribution activities. The work is split into two lots: maintenance of the SAP system, and upgrades and adaptations of the SAP system. The buyer plans to sign a framework agreement with one supplier for each lot, running for 24 months.