ROCalarasi, Romania20 days left
The buyer ECOAQUA SA wants design and construction works for a regional water supply system in Ialomita county. Scope covers water intake wells, treatment plants, transport pipes, wastewater pumping stations and sewer networks. Work includes the detailed technical design, the designer's technical assistance, and permit documents. Construction is split into four sectors: Urziceni and Reviga water systems, Urziceni sewer extension, and pumping stations in Manasia, Alexeni and Cosereni. Full details are in the specifications.
ROIasi, Romania13 days left
The buyer wants design and construction work to improve energy efficiency in 7 administrative buildings of the Iasi Border Police. Scope covers the technical design phase and building works, aimed at cutting energy use and improving building operation. The contract is split into 7 lots, one per building, at sites in Iasi, Albita, Vaslui, Berezeni, Botosani and Stanca. Funded by an EU regional programme and the state budget.
ROGiurgiu, Romania13 days left
The buyer, APA SERVICE SA, wants a contractor to design, build and provide technical assistance for a wastewater treatment plant at Cosoba, Giurgiu, Romania. The designer must support the works during construction. The work follows the tender specifications. It is a single lot, awarded through an open procedure.
ROOradea, Romania23 days left
The buyer, the county emergency clinical hospital in Bihor, wants construction works for the development and operation of a mental health centre within its new medical infrastructure in Oradea. This is an open procedure for works. The notice gives one default lot and no further scope details.
ROBuftea, Romania17 days left
The buyer wants a contractor to design and build a new transport depot in Buftea, Ilfov County. Scope includes an administrative building, a repair workshop with car wash and inspection station, and a bus parking canopy. Works also cover paved areas, 24 parking spaces, fencing, and a rooftop solar system of at least 146.25 kWp. Ten overnight bus chargers, two 22 kW car chargers and an energy audit are included. Duration: 18 months (3 months design, 15 months construction).