CZPraha, Czechia29 days left
The buyer, the Czech Road and Motorway Directorate, wants a contractor to build the I/45 Krnov western bypass. The work is a new road about 3.4 km long, routed outside the built-up area of Krnov. It includes a connection to road I/57. This is a single lot, procured by open procedure.
CZHradec Králové, Czechia23 days left
The buyer, Královéhradecký kraj, wants a contractor to build the bridge "Most ev. č. 32329-4 Boharyně" in the Boharyně area, Czechia. This is a single lot under an open procedure. The notice gives no further scope details; full information is in the tender documents.
CZKarlovy Vary, Czechia10 days left
The Karlovy Vary Region is seeking a contractor to build a new building for the Střední školy živnostenské Sokolov vocational school in Sokolov. The works cover the main building, several supporting structures and engineering works, and the operating facilities needed to run the school. The contractor must also prepare as-built documentation using BIM and obtain SBToolCZ certification for the school, at least bronze level.
CZKopřivnice, Czechia22 days left
The buyer wants construction works to convert a former primary school building on Náměstí in Kopřivnici. One part turns the existing annex into a residential building, adding an upper floor and underground parking. The other part converts the main former school into a municipal library with visitor and staff facilities, plus space for cultural, educational and leisure activities. Work includes demolition, structural changes, windows, insulation, new building services, utility connections, rainwater management, paving and landscaping. The parts are not separate lots.
CZVelké Bílovice, Czechia15 days left
The buyer, the town of Velké Bílovice, wants construction works for phase two of a new senior housing site. Scope includes one gallery-access apartment block, five terraced houses with two flats each, and five terraced houses with one flat each. The works also cover site utility networks, internal access roads with connections to existing roads and utilities, and a green-blue courtyard. Phase one, a care home for seniors, is already built.