CZLovosice, Czechia8 days left
The buyer, the City of Lovosice, wants a new electricity supply for the CŠJ Lovosice building, which is being revitalised. The contract covers supplying a new customer transformer substation, plus assembly, installation, earthing and ground works. The substation is a prefabricated, complete unit, delivered to site, fitted, connected and commissioned. Groundwork is a small part of the value. Single lot, open procedure.
CZČeské Budějovice, Czechia34 days left
The buyer, a heat and power company, wants a battery energy storage system supplied and installed in České Budějovice. Scope includes two container substations and two battery containers, power connection electrical works, and control systems linking the storage to existing technology. The work includes preparing construction project documentation and meeting fire service and authority conditions. Supply and installation of all components is included. The procedure is an open tender.
CZKlimkovice, Czechia29 days left
The buyer wants a full supply package for wind farm grid connections near Klimkovice. Scope includes 22 kV cable network with fibre-optic ducts, switching stations SS1, SS2 and SS4 with high-voltage switchgear, reactors and low-voltage equipment, and metering. Also required: parameterisation, agreement with the grid operator ČEZ Distribuce, dispatch control and a local control system, plus commissioning and support for permanent operation.
NOFrekhaug, Norway31 days left
Alver municipality, through its Property Department, wants a framework agreement for supplying electrical materials for operation and maintenance. The contract mainly covers supplies for work the municipality carries out itself. It is a single lot, procured by open procedure. The buyer may buy from other framework agreements, hold separate competitions for larger call-offs, or use specialist wholesalers when this brings clear advantages.
ATBregenz, AustriaNo deadline given
The buyer, Vorarlberger Energienetze GmbH in Bregenz, wants to buy medium-voltage cables under a framework agreement. The tender covers supplies for 2027 to 2029, with an option to extend to 2030 to 2034. It is a single lot. The buyer uses a negotiated procedure with a call for bids. Full specifications are in the attached tender documents.