FREtrechy, France34 days left
The buyer, Communauté de communes Entre Juine et Renarde, wants a design team for rehabilitating the Étréchy wastewater treatment plant (STEU). Core tasks: diagnosis, preliminary and detailed design, tender support for works, approval of execution drawings, site supervision, and handover assistance. The contractor also coordinates scheduling, steering and coordination. Optional extra tasks are ordered by purchase order: planning permits, geotechnical and inspection missions, safety coordination, performance tests, and water-law permit files.
FRMarseille, France30 days left
The buyer, DREAL PACA, wants topographical surveying services for various road projects it manages in the Provence-Alpes-Côte d'Azur region. This is an open procedure for services. The notice lists one lot for topographical services. Details on scope per project and duration are not stated in the summary notice.
FRNice, France35 days left
The buyer wants periodic statutory checks of electrical installations at member establishments of its purchasing group on the Côte d'Azur. Work is split into two lots: sites in Alpes-Maritimes (06) and sites in Var (83). It includes a fixed-price annual inspection part and a purchase-order part for extra checks, such as initial inspections, re-inspections and infrared thermography.
FRPuteaux, FranceNo deadline given
The buyer, Enedis SA, wants a supplier for capture, support control and study of grid non-conformities (NCR) for its Auvergne regional division. The notice is one lot, titled ENEDIS PFA LYON, for the period 2027-2032. The procedure is negotiated with a call for competition. The notice gives no further scope details.
FRANGERS cedex 02, FranceNo deadline given
Angers Loire Metropole wants a team for strategic studies and operational design of public spaces in Angers city centre, to calm traffic and redevelop streets and squares. It is a framework agreement with no guaranteed minimum, signed with three firms. Work is ordered through subsequent contracts and purchase orders. The first order, a master plan, starts at the same time as the framework.