CZPardubice - Pardubice-Staré Město, Czechia9 days left
The buyer wants a road modernisation on section II/355 between the municipalities of Chrast and Hrochův Týnec, about 7.66 km long. Work covers the road structure and asphalt layers, widening on bends to a standard category width, and the drainage system. It also includes vegetation clearance, road signs, safety barriers and guide posts. New footpaths, bus stops and crossings must meet Czech standards. The works require temporary and permanent land occupation.
CZOlomouc, Czechia33 days left
The buyer, Olomoucký kraj, wants construction works for a museum and gallery project in Prostějov, including the Hvězdárna (observatory). The existing observatory will be demolished and a new one built. The new building is about 64.6 m x 14.6 m x 11.3 m, holds up to 200 people, and has one underground and three above-ground floors. It will connect to existing utility networks in Kolářovy sady and nearby areas through new service connections.
CZPraha, Czechia33 days left
The buyer wants the first stage of a new road diversion for road I/45, a first-class road about 5.0 km long. The road is being moved above the future reservoir flood zone at Nové Heřminovy. The works include roundabouts and junctions, several bridges, retaining walls, noise barriers, and upgrades to lower-class roads affected by the works. The works follow the project documentation provided with the notice. It is a single lot.
CZPraha, Czechia28 days left
The buyer, the Czech Road and Motorway Directorate, wants a contractor to build the I/45 Krnov western bypass. The work is a new road about 3.4 km long, routed outside the built-up area of Krnov. It includes a connection to road I/57. This is a single lot, procured by open procedure.
CZBrno - Pisárky, CzechiaNo deadline given
The buyer, Brno public transport company, wants a contractor to modernise the Komín tram depot in Brno-Pisárky. Work includes demolishing existing buildings, then building a trolleybus parking hall, a maintenance and repair hall, staff facilities and car parking. A new fire station and road access works are also included. The depot stays partly operational during works. Design and demolition start in parallel. The contract follows FIDIC Yellow Book terms. It is a single lot.