CZZlín, Czechia2 days left
The buyer, Zlín Region, wants construction works to protect the Holešov strategic industrial zone from flooding. The works follow the project design for water infrastructure inside the zone (east and south parts). The aim is to stop surface water flowing in when the Mojena river overflows its banks. Full specification is in the tender documents and their annexes.
CZPraha, Czechia9 days left
The buyer wants a new four-storey car park building in Kolín with 358 parking spaces. The work also includes repairs to nearby paved areas, new greenery, and road works on Starokolínská street, from the car park to the new underpass at the railway station. This is a single-lot works contract.
CZPraha, Czechia41 days left
The buyer, the Czech road and motorway directorate, wants a new bypass to remove traffic problems on the I/55 road through Břeclav. It also covers the connecting section of road I/40 through the district of Poštorná. The new route will run outside the built-up area, mostly across farmland, to carry transit traffic from the D2 motorway towards the Austrian border. This is an open tender for construction works, in one lot.
CZHradec Králové, Czechia14 days left
The buyer wants construction works to convert a former railway coal-thawing tunnel in Kladská street, Náchod, into a storage depot for the Náchod Museum. Works include demolition, a new industrial floor, a partition wall, motorised sectional gates, new doors and windows, roof and façade repairs, and new electrical and warm-air ventilation systems. Outdoor works cover removing old rail tracks, a paved access road, parking, new fencing with a sliding gate. Works follow the project documentation and building permit conditions.
CZOlomouc, Czechia21 days left
The buyer wants construction works to fully renovate three former kindergarten buildings on Pod Skalkou in Přerov, Předmostí. Two buildings will become a home for people with disabilities, with staff facilities. The third building will get new rooms for a local branch of a social prevention centre. Paths, a car park and planting will be built on the surrounding plots.