PLPoznań, Poland14 days left
AQUANET S.A. wants a contractor to build a stormwater retention reservoir (ZR3) at Straży Ludowej street in Poznań. Scope includes ditch reshaping, new culverts, an access road and ramp, technical infrastructure, site levelling with a path, and landscaping. The contractor must obtain the tree-felling permit and provide design supervision during works, with 16 supervision cards in total. Single lot.
PLPoznań, Poland36 days left
Aquanet S.A., a water utility in Poznań, Poland, wants a contractor to carry out repair and maintenance works on water pipelines and water connections in the Winogrady area of Poznań. It is a single open-procedure works contract, with one lot. The notice is in Polish and gives no further scope details.
PLSzczecin, Poland19 days left
The buyer wants a contractor to build a bypass around the town of Pyrzyce, on the west side, along voivodeship road 119. The road is about 7.5 km long and includes lighting, a technical duct, bridges, a level crossing, noise screens, culverts, a cycle and footpath, and side roads. Work also covers tree felling, demolition, utility clearance, road safety equipment and road markings. This is a single lot. The buyer may also award repeat similar works by direct award.
PLŁódź, Poland26 days left
The buyer wants a contractor to build a section of the Wiskitno bypass in Łódź, from the junction of roads I KDGP and I KDG 16 KDL to Trasa Górna III, including related infrastructure construction and reconstruction. The contractor must also update and complete permits and documents, obtain the final road investment permit (ZRID), and provide copyright supervision by qualified designers until final acceptance. The notice is a single lot.
PLOżarów Mazowiecki, Poland8 days left
The buyer, Gmina Ożarów Mazowiecki, wants one exploration-production water well (OI-1) built and fitted out at Święcice, Poland. The work includes geodetic support, as-built survey documents, and obtaining the use permit. The contractor must also prepare the water permits needed to start the intake and draw water. Works must be coordinated with another contractor building a treated water tank at the site.