CZPraha, Czechia32 days left
The buyer wants the first stage of a new road diversion for road I/45, a first-class road about 5.0 km long. The road is being moved above the future reservoir flood zone at Nové Heřminovy. The works include roundabouts and junctions, several bridges, retaining walls, noise barriers, and upgrades to lower-class roads affected by the works. The works follow the project documentation provided with the notice. It is a single lot.
CZPraha, Czechia40 days left
The buyer, the Czech road and motorway directorate, wants a new bypass to remove traffic problems on the I/55 road through Břeclav. It also covers the connecting section of road I/40 through the district of Poštorná. The new route will run outside the built-up area, mostly across farmland, to carry transit traffic from the D2 motorway towards the Austrian border. This is an open tender for construction works, in one lot.
CZPraha, Czechia27 days left
The buyer, the Czech Road and Motorway Directorate, wants a contractor to build the I/45 Krnov western bypass. The work is a new road about 3.4 km long, routed outside the built-up area of Krnov. It includes a connection to road I/57. This is a single lot, procured by open procedure.
CZOlomouc - Nová Ulice, Czechia14 days left
The buyer, Fakultní nemocnice Olomouc (University Hospital Olomouc), wants the reconstruction of sewers at buildings A, Z, X and Y and across the hospital site in Nová Ulice, Olomouc, including the Hněvotínská street area. The works repair emergency damage to the sewers and the nearby inspection shafts. A warranty of at least 36 months is required. This is a single lot, awarded through an open procedure.
CZFrenštát pod Radhoštěm, Czechia4 days left
The buyer, the town of Frenštát pod Radhoštěm, wants one contractor under a framework agreement to repair road surfaces in its cadastral area. Work includes removing old asphalt and disposing of it, laying new asphalt, repairing kerbs, drains and manholes, restoring traffic signs, and temporary traffic management. The contractor also prepares the design, surveys utilities and provides the final as-built survey. One lot.