SKKošice, Slovakia33 days left
The buyer wants a 1,672 m water supply main rebuilt between Viničky and Ladmovce, outside built-up areas, on the right bank of the Bodrog stream. Most of the pipe is 500 mm ductile iron (1,645 m). A 27 m section under the Bodrog flood embankment gets an inserted HDPE pipe. Works include open-trench laying, pressure tests, flushing, disinfection and site reinstatement. Work is phased to keep supply running.
SKSliač, Slovakia7 days left
The buyer, Kúpele Sliač spa operator, wants a general contractor to reconstruct parts of the protected KH Palace building and add a new pool hall extension. The work creates wellness and balneotherapy facilities, including technology systems. Scope covers finishing design documents, coordinating all trades, construction, installing and commissioning wellness technology, complex testing, and as-built documentation. The building is a national cultural monument, so all work must respect its heritage value. Single contract, works, open procedure.
SKBratislava - mestská časť Karlova Ves, Slovakia42 days left
The buyer wants a road modernisation on route I/66 past Vaľkovňa, towards Telgárt, covering about 3.00 km. Work includes resurfacing and widening the carriageway, drainage and ditches, culvert renewal, junction works with road III/2387, new guardrails and road markings, and reconstruction of two bridges.
SKBratislava - mestská časť Karlova Ves, Slovakia5 days left
The Slovak Road Administration wants a contractor for works on a 2.075 km section of road I/65 bypassing Stará Kremnička, outside Bratislava in the Žiar nad Hron district. Scope includes a new noise barrier, reconstruction of bridge no. 65-058, a detour route for the bridge works, tree felling, and road adjustments. Single lot, open procedure.
SKBratislava - mestská časť Ružinov, Slovakia28 days left
The buyer wants a contractor to build a new 110/22 kV electrical substation (ESt Geča) in the Valaliky Strategic Area, Ružinov, Bratislava. Scope includes project documentation, permitting and engineering services, the environmental impact assessment (EIA), changes to affected zoning plans, cable routes, equipment supply and installation, testing and commissioning. It is a single lot.