RODumbravita, Romania20 days left
The buyer, Dumbravita commune, wants a new school building for primary and lower-secondary pupils in Dumbravita, Timis County. The project aims to ease overcrowding in existing schools and meet current safety, accessibility and equipment standards. Scope includes construction works, installations, functional equipment fitted on site, and site organisation. This is a single lot, works contract, awarded by open procedure.
ROMarculesti, Romania27 days left
The buyer, an inter-municipal development association, wants a contractor for design and construction works. The project sets up an intelligent natural gas distribution system in Marculesti, Gheorghe Lazar, Scanteia, Cosambesti, Bucu and Valea Ciorii, in Ialomita County. Scope includes the detailed technical design and execution details, technical supervision by the designer during works, and all construction works in the feasibility study. It is one lot.
ROGalati, Romania28 days left
The buyer, Galati County Council, wants a renewable energy production system for Targu Bujor town hospital. The contract covers technical design, permit documentation, execution drawings, designer technical assistance, technical checking, and construction and installation works. It is one lot, tendered by open procedure. The design services and the works are estimated in the notice.
ROUricani, Romania35 days left
The buyer, Uricani town hall, wants a contractor to carry out energy efficiency works on Block 2, Strada Muncii, in Uricani, Hunedoara County. The building has five storeys above ground, 54 two-room flats and ground-floor shops. It is funded by a regional EU programme. The work is a single lot. Bidders may ask questions before the deadline; the buyer will answer them.
ROFocsani, Romania21 days left
The buyer wants a contractor to design and build a new accommodation pavilion at military barracks 329 Boboc in Focsani, Romania. The work covers design, permits and approvals, technical checks, detailed execution drawings, construction and installation, plus the designer's technical support during works. Single lot, open procedure. Design takes 90 calendar days; construction takes 640 calendar days. Guarantee of at least 60 months after handover.