SKLiptovský Mikuláš, Slovakia6 days left
The buyer, the City of Liptovský Mikuláš, wants a regular supply of electricity to its metering points and those of its organisations. The supplier must take on imbalance responsibility, distribution and electricity excise duty, in line with grid operator rules and Slovak law. The contract runs from 1 January 2027 to 31 December 2027, with an option to extend by 12 months. Estimated consumption for 2027-2028 is 6,604.45 MWh. Full details are in the tender documents.
PLOtwock, Poland34 days left
The buyer, H2Otwock, wants to buy electricity supply for the Jerzy Iwanow-Szajnowicz Municipal Swimming Pool in Otwock, Poland. This is a supply contract run as an open procedure. The notice describes a single lot covering electricity delivery for the pool.
SIKoper - Capodistria, Slovenia12 days left
The buyer, a public water utility in Koper (Capodistria), Slovenia, wants to buy electricity supply. The contract covers the calendar year 2027, from 1 January to 31 December 2027. The procurement is a single lot, awarded through an open procedure. The notice itself gives only the title and no further scope details.
PLSzczecin, Poland34 days left
The buyer, the Szczecin Voivodeship Police Headquarters, wants electricity supplied to police units across the West Pomerania garrison. The supply covers 99 electricity metering points. Estimated consumption is about 12,138 MWh, plus an optional 1,820 MWh. The contract runs 24 months from signing. Distribution services are bought separately and are not part of this contract.
ESSantander, Spain29 days left
The buyer wants a framework agreement for electricity supply to the regional administration and institutional public sector of Cantabria. The contract is split into two lots: Lot 1 covers low voltage and Lot 2 covers high voltage. This is an open procedure for supplies.