FRVersailles, France31 days left
The buyer HYDREAULYS wants engineering design, project management and technical studies for its GEMAPI river management duties. It is a framework agreement with one economic operator, used through orders and follow-on contracts. Services may include feasibility studies, bank and watercourse surveys, hydraulic studies, flow and water-quality measurements, public interest declaration files, water law permits, funding applications, and works supervision.
FRDunkerque, France42 days left
The buyer wants a firm to take over the design-supervision (maîtrise d'oeuvre) role for public spaces in the NPNRU urban renewal zone (ZAC) of western Saint-Pol-sur-Mer, near Dunkirk. The areas are Jean Bart Guynemer and the Cité des cheminots. This is a framework agreement awarded through an open procedure.
FRAubervilliers, France31 days left
The town of Aubervilliers and its social services centre (CCAS) want a framework agreement for technical assistance and OPC (scheduling, steering and coordination) missions. The work supports new-build and renovation projects on municipal buildings and outdoor structures, plus substitution works on private buildings and land. The contract is awarded through an open procedure.
FRSaint-Brieuc, France32 days left
The hospital buyer in Saint-Brieuc wants periodic technical inspections for several hospitals in the Armor regional hospital group. The work is a framework agreement, with orders placed as needed. There are 8 separate lots, each awarded on its own. Lots cover electrical, fire safety and smoke extraction, heating, mechanical systems, and qualification of cleanrooms, sterilisers, washers, endoscope washers and pasteurisers. Prices are unit and fixed rates.
FRLe Robert, France21 days left
The buyer, GIP Sargasses, wants maintenance services for anti-sargassum dams in Le Robert, Martinique (France). The work is split into two separate lots: preventive maintenance (routine upkeep and small repairs) and curative maintenance (major repairs). Each lot will be awarded separately. This is a framework agreement, with work ordered through later contracts priced by unit rates and fixed prices.