CZKarlovy Vary, Czechia8 days left
The buyer, Karlovarský kraj, wants a new base for its helicopter emergency medical unit near Karlovy Vary international airport, outside the restricted security zone. The base includes an operations building with a hangar for two helicopters and garage space for three response vehicles, plus offices. It also covers a helipad with FATO and two TLOF areas, paved yards and access roads, a new electricity substation with grid connection, utility connections, an underground rainwater retention tank, an oil separator, and landscaping with tree felling and replanting. One lot.
CZOstrava - Moravská Ostrava, Czechia20 days left
The buyer wants repair works on a school building in Český Těšín, a building damaged by fire. Works include new ceilings, new internal walls, the attic and related internal layout changes. A new outdoor staircase and a lift will also be built. The notice has one lot.
CZPraha, Czechia30 days left
The buyer wants a new road maintenance depot (SSÚD) built at Střítež, near Praha. The depot will keep about 50 km of motorway in one direction open all year. Its work includes cleaning and repairing the road surface, drainage, guardrails, road markings and signs, and vegetation care on nearby road land. The site sits next to the planned road, with a direct link to the motorway via a roundabout at the MÚK Střítež junction. This is a single lot.
CZPrakšice, Czechia30 days left
The buyer, the municipality of Prakšice, wants a contractor to build a new apartment block with 12 flats. The building has three above-ground floors plus an attic. It will stand alone on its plot, set back from the boundaries. The site is in a buildable part of the village. This is a single lot, procured by open procedure.
CZVelké Bílovice, Czechia8 days left
The buyer, the town of Velké Bílovice, wants construction works for phase two of a new senior housing site. Scope includes one gallery-access apartment block, five terraced houses with two flats each, and five terraced houses with one flat each. The works also cover site utility networks, internal access roads with connections to existing roads and utilities, and a green-blue courtyard. Phase one, a care home for seniors, is already built.