PLWarszawa, PolandCloses today
The buyer wants a supplier for electricity supply and purchase (buy-back) for the sites listed in the tender specification (SWZ). The work covers 2027 to 2029 and includes street lighting and several consumer tariff groups. Supply must follow Polish energy law and the quality rules set out in the notice.
PLWarszawa, Poland33 days left
The buyer wants a full heat purchase contract for five school and nursery buildings in the Wawer district of Warsaw, covering heat sales plus transmission and distribution. Period: 1 January 2027 to 31 December 2028, or until the maximum contract value is used up. It is a single lot. Quantities are forecasts for bid comparison, not firm commitments. Billing is based on actual use, with separate calculation for each building.
PLGórki Wielkie, Poland14 days left
The buyer wants a supplier for natural gas fuel for its buildings and those of its organisational units in Cieszyn County. The contract covers purchase and delivery of gas for an estimated total of 4,364,600 kWh. Delivery runs for the whole of 2027, from 1 January to 31 December. This is a single contract, not split into lots.
PLStarachowice, Poland10 days left
The buyer, Gmina Starachowice, wants a solar photovoltaic installation built at the city bus depot to power electric buses. Scope: a 149.94 kWp PV array of 306 modules (490 Wp each) on a free-standing frame, three 50 kW inverters, an energy storage unit (200 kW, at least 500 kWh), AC and DC switchboards with protections, and AC, DC and communication cable routes. Equivalent or better products are accepted. The work is part of an EU-co-financed public transport project.
PLWisła, Poland14 days left
The buyer, a swimming pool company in Wisła, Poland, wants electricity for the facilities of its purchasing group that have photovoltaic installations. The contract runs for 2027 (1 January to 31 December). It has three lots: Lot 1 is a full supply contract (electricity sales plus distribution) under net-metering, with the supplier paying distribution charges on the net difference. Lot 2 is electricity purchase under net-billing, with the supplier not paying distribution charges. Lot 3 is electricity purchase plus the buyer selling surplus energy to the supplier.