CZHradec Králové, Czechia8 days left
The buyer wants construction works to convert a former railway coal-thawing tunnel in Kladská street, Náchod, into a storage depot for the Náchod Museum. Works include demolition, a new industrial floor, a partition wall, motorised sectional gates, new doors and windows, roof and façade repairs, and new electrical and warm-air ventilation systems. Outdoor works cover removing old rail tracks, a paved access road, parking, new fencing with a sliding gate. Works follow the project documentation and building permit conditions.
CZOstrava, Czechia21 days left
The buyer, the Technical University of Ostrava (VŠB-TUO), wants the full interior reconstruction of two university pavilions, E and F, on its Ostrava-Poruba campus. Work includes new interior surfaces, floors, wall and ceiling finishes, and internal doors. Building services will be modernised, including water, drainage, power and low-current wiring, ventilation, cooling, partial heating and gas, plus compressed air and control systems. The contract also covers tests, inspections, as-built documentation and BIM delivery.
CZBrno, Czechia34 days left
The buyer wants a building contractor to reconstruct and extend a former horse stable at the Žabčice school farm, near Brno. Part of the existing building will be removed and replaced by a new two-storey extension, mainly used as a teaching space. The work also includes new utility networks, relocating some existing networks, a new rainwater retention tank and infiltration basin, and a new transformer station with a backup power source. This is a single lot, awarded through an open procedure.
CZOstrava - Moravská Ostrava, Czechia20 days left
The buyer wants repair works on a school building in Český Těšín, a building damaged by fire. Works include new ceilings, new internal walls, the attic and related internal layout changes. A new outdoor staircase and a lift will also be built. The notice has one lot.
CZOstrava, Czechia13 days left
The buyer, a technical university in Ostrava, wants a building contractor to convert an existing heat exchange station in the Energoblok building into a laboratory. The lab will house a vibration test rig with a climate chamber for lifetime, climate and battery cell testing. Work includes necessary demolition, a new enclosed space, refurbishment of changing rooms, showers, toilets, a day room, corridors and a control room, new roller doors, and an outdoor chiller on its own foundation with fencing and a steel staircase. Single lot.