ESIrun, Spain24 days left
The buyer, Irun city council, wants a firm to prepare the design project for the sports facilities at Txenperenea in Irun. This is a services contract awarded through an open procedure. The notice has one lot, covering the drafting of the project. The notice does not give further scope details.
ESSantiago de Compostela, Spain43 days left
The buyer wants firms to supervise construction and coordinate health and safety for a new building with 92 public-protection (VPP) homes, garages and storage rooms. The site is on plots P.4 and P.5 of zone Z-3, Avenida 3 de Abril, in Narón (A Coruña). The tender has two lots: Lot 1 is execution supervision of the works; Lot 2 is health and safety coordination during construction.
ESAlmería, Spain23 days left
The buyer, the Almería Port Authority, wants a firm to supervise the construction of seafront works at the port-city area of Almería. The service covers site management, health and safety coordination, technical consultancy, technical assistance and quality control. The provider will check the works against the project, environmental, quality and safety rules, and monitor costs. It also covers checking the contractor's technical, economic and administrative obligations. Single open procedure, services contract.
ESValencia, Spain34 days left
The buyer, the Valencia regional education and culture department, wants design services for work on several monuments in Sagunto. The service covers basic and execution design, activity project, self-protection plan, site management, health and safety coordination and archaeology. There are three lots: repairs to the Roman Theatre, works at the Epigraphic Centre and adjoining building in the Castle, and fitting out the Nave Talleres for multi-use. Open procedure.
ESMadrid, Spain1 day left
The buyer, Administrador de Infraestructuras Ferroviarias, wants technical assistance to coordinate health and safety during maintenance works on high-speed lines that are in operation. This is a services contract under an open procedure. The notice states a single lot and gives no further detail on scope or duration.