CZNymburk, CzechiaEnergy, fuel and utilities20 days left

Solar PV power plant supply and installation for two sites in Nymburk, Czechia

Deadline 2026-11-30Value 7.1M CZK

Log in to save this tender or create a free account

What they want

The buyer, the City of Nymburk, wants a new solar photovoltaic power plant supplied and installed. Work includes connecting it to the existing building electrics, linking it to the buyer's grid, and servicing, with spare parts guaranteed. Equipment must be new and unused. The tender has two lots: the swimming pool part and the ice rink part, covering the Zimní stadion and Relaxační centrum Labe sites.

Who it suits

Solar PV installers, electrical contractors and energy system suppliers able to deliver, install and service commercial PV systems.

Good to know

  • Open procedure: bids are made against the binding contract templates in the tender documents (Annexes 8 and 9).
  • Two separate lots: swimming pool part and ice rink part; bidders may bid for one or both.

Keywords

solar PVphotovoltaic installationsolar panelselectrical installationgrid connectionNymburkmaintenance service

Original title

FVE – Zimní stadion Nymburk a Relaxační centrum Labe

Lots

  • FVE – Zimní stadion Nymburk a Relaxační centrum Labe - část Bazén
  • FVE – Zimní stadion Nymburk a Relaxační centrum Labe - část Zimní stadion

Bid through the official notice

Documents, contact details and the way to submit a bid are in the official notice.

Read the official notice and bid →

Source: TED, © European Union (CC BY 4.0), and Find a Tender (UK, Open Government Licence v3.0). Summaries are written by AI and may contain mistakes: always check the official notice.

Similar open tenders

CZHradec Králové, Czechia10 days left

Solar PV power plants on four school buildings in Hradec Králové, Czechia

The buyer, the city of Hradec Králové, wants four rooftop solar PV power plants installed on nursery and primary school buildings it owns. Work includes supply and installation, connection to the existing building electrics and the grid, related building works, test operation, monitoring, and operational servicing for 5 years. This is one open-procedure tender with a single lot.

Energy, fuel and utilitiesBuyer Statutární město Hradec KrálovéValue 8M CZKDeadline 2026-11-20
CZVolary, Czechia31 days left

Design and build of solar PV systems with batteries for two buildings in Volary, Czechia

The town of Volary wants a contractor to design and install solar photovoltaic systems on town buildings. Phase 1 is detailed design: electrical implementation documents, fire safety solution and lightning protection design. Phase 2 is the build. The primary school gets at least 49.96 kWp PV with at least 49.96 kWh usable battery. The kindergarten gets at least 36.85 kWp PV with at least 36.85 kWh battery. Includes monitoring and community energy management software, and setting up an energy community with grid registration.

Energy, fuel and utilitiesBuyer Město VolaryValue 5.3M CZKDeadline 2026-12-11
CZPlzeň - Severní Předměstí, Czechia20 days left

Solar photovoltaic system for a hay store and African hoofstock pavilion in Plzeň, Czechia

The buyer, the Zoological and Botanical Garden of the City of Plzeň, wants a new solar photovoltaic system to cut its electricity costs. It will be installed at two sites in the Radčice complex: the African hoofstock pavilion and the hay store. This is a single-lot supply and installation contract run as an open procedure.

Energy, fuel and utilitiesBuyer Zoologická a botanická zahrada města Plzně, příspěvková organizaceValue 4.7M CZKDeadline 2026-11-30
CZNový Jičín, Czechia29 days left

Electrical, heating and rooftop solar works for an office building in Nový Jičín, Czechia

The buyer, the town of Nový Jičín, wants a full renovation of an administrative building at Suvorovova 1854/152. Work covers complete power and low-current wiring, new switchboards, lighting, sockets and data outlets. It also includes replacing two gas boilers with a condensing gas boiler and an electric boiler, and radiator refits. The roof will get insulation, a new roof covering and a 48 kWp solar system with a 48 V battery store. Ongoing solar service support is included. Single lot.

Energy, fuel and utilitiesBuyer Město Nový JičínValue 27.4M CZKDeadline 2026-12-09
CZPraha - Holešovice, Czechia31 days left

Solar PV power plants at four storage sites in Czechia (Praha, Holešovice)

ČEPRO, a.s. wants new solar photovoltaic (PV) power plants built at its storage sites. Work covers construction, installation, final inspection and full commissioning, plus the required permits, design documents and as-built documentation. The tender has four lots: Nové Město (499.5 kWp), Šlapanov (994.5 kWp), Potěhy (499.5 kWp) and Cerekvice (499.5 kWp). Supplied technology must integrate fully with the buyer's existing SolarEdge monitoring system, or an equivalent solution.

Energy, fuel and utilitiesBuyer ČEPRO, a.s.Value 70M CZKDeadline 2026-12-11

More from Město Nymburk: open tenders and who won before →