The buyer wants a contractor to prepare an extended concept design and full engineering-geological surveys for a new road route from Svishtov to the Ruse–Veliko Tarnovo motorway. The route is about 25 km (Option 1) or 33 km (Option 2). The design includes a cycle path that forms part of EuroVelo 6. The design must be delivered in three project stages, covering many technical parts.
Architecture, engineering and surveyingBuyer АГЕНЦИЯ "ПЪТНА ИНФРАСТРУКТУРА"Value €600kDeadline 2026-11-16
Contracts ending soon
These usually come back as new tenders a few months before they end.