PLPiotrków Trybunalski, Poland19 days left
Design-and-build of a 4.3 MWe gas cogeneration plant in Piotrków Trybunalski, Poland
The buyer wants a design-and-build contract for a high-efficiency gas cogeneration plant at Ciepłownia C1 heating plant. The plant has two cogeneration units of 2.15 MWe gross each, 4.3 MWe in total. Scope includes the building, heat recovery, gas and flue systems, heat pumps, electrical, control and SCADA systems, and connection to the existing plant. Work continues on a live site. Includes commissioning, a 72-hour trial run and at least 24 months of servicing.
Construction worksBuyer Elektrociepłownia Piotrków Trybunalski Sp. z o.o.Value 34.5M PLNDeadline 2026-11-25