PLWieliczka, Poland14 days left
The buyer, Gmina Wieliczka, wants a contractor to design and build a three-level park-and-ride and bike-and-ride car park next to the Wieliczka Park railway station. It must hold 250 cars and 30 bicycles. The building is about 74.25 m by 34.10 m, with two above-ground levels plus a usable roof. The work is part-funded by an EU programme. Single contract, open procedure.
PLWrocław, Poland24 days left
The buyer, the City of Wrocław, wants a contractor to design and build a new archive building with a shelter at Hubska 8-16 in Wrocław. The work is procured as design-and-build, so the contractor handles both design and construction. This is a single lot, awarded through an open tender.
PLKrosnowice, Poland24 days left
The buyer, a municipal water utility, wants flood-damaged water and sewage infrastructure rebuilt in the Kłodzko commune. The contract has three lots: (1) rebuilding and upgrading the Ołdrzychowice Kłodzkie sewage treatment plant; (2) rebuilding and upgrading water treatment stations and intakes at Krosnowice and Jaszkowa; (3) rebuilding flood-damaged sewage pumping stations and emergency water mains in Krosnowice. Bidders may bid for one, several or all lots. The works are partly EU-funded.
PLJuchnowiec Kościelny, Poland14 days left
The buyer, Gmina Juchnowiec Kościelny, wants the site of a school complex developed in Juchnowiec Górny. Scope includes a storage building with a bin enclosure, a children's canopy by the teaching building, a car park for 67 cars with drainage and lighting, new paving and steel-railed steps, and bike stands, planters, bins and benches. Stands and flagpoles are excluded.
PLJuchnowiec Kościelny, Poland7 days left
The buyer, the commune of Juchnowiec Kościelny, wants a new sports complex built in Juchnowiec Dolny. Scope includes a club building with changing rooms, a utility building, renovation of a natural-grass pitch, a new artificial-turf pitch, a leisure shelter, and small architecture with site development. Works include demolition of existing structures, removal of conflicting utilities, and tree felling. This is a single lot.