DEMünstertal, GermanyNo deadline given
The buyer, the municipality of Münstertal, wants general planning services for the third construction phase of the L123 road upgrade. Scope covers engineering structures, traffic facilities, and technical building equipment (building services group 4). The procedure is negotiated with a call, with one lot.
DESchopfheim, Germany28 days left
The buyer wants planning services to renovate and modernise the Schopfheim outdoor swimming pool. The tender is split into five lots: structural engineering, civil engineering structures, outdoor facilities, and two building services lots (technical equipment, and heating, ventilation and sanitary). Bidders may apply for several lots and offer a combined discount. The buyer may award lots to different firms.
HRŠibenik, Croatia15 days left
The buyer, a water and drainage utility, wants project management and legal advisory services for its Vodice-Tribunj-Srima wastewater project. Support covers preparation and delivery of five contracts: sewer and water network extension, treatment plant extension, supervision services, promotion and visibility services, and equipment supply for the Jaruga water intake. Details are in the terms of reference.
FRCréteil Cedex, France44 days left
The Val-de-Marne Departmental Council, through its Buildings Directorate, wants firms to provide scheduling, steering and coordination (OPC) for building works across its buildings. Work covers construction, restructuring, renovation, heavy maintenance, fit-out and upgrading, on occupied or empty sites. The contract is split into two lots: a Centre and PACT sector, and an East and West sector.
FITampere, Finland28 days left
The buyer, Tampere University and Tampere University of Applied Sciences, wants construction-related expert services through a framework agreement. Seven lots: construction consultancy and supervision, main and architectural design, structural design, HVAC design, electrical design, indoor air and building condition surveys, and AV design and supervision. Up to five suppliers will be selected per lot. The framework runs four years.