HRGrad Zagreb, Croatia38 days left
The buyer, City of Zagreb, wants a project manager for the EU co-funded Zagreb Project to develop the agglomeration's water and utility infrastructure. Scope covers seven activities: a water supply zone, sewer and water networks in three groups (A, B, C), upgrading the central wastewater treatment plant, and information and visibility work. Includes FIDIC engineer tasks, tender evaluation and BIM model work for activities 5 and 6.
SEBorlänge, Sweden29 days left
The buyer, Trafikverket (Swedish Transport Administration), wants a supplier for standby readiness and damage inspection of structures in Greater Gothenburg, Västra Götaland County. This is an open-procedure services contract with a single lot. The notice gives no further detail on scope or duration.
DEMünchen, GermanyNo deadline given
The buyer wants project management and BIM management services for the general renovation of the German Patent and Trade Mark Office building on Zweibrückenstraße in Munich. The site has two main buildings, a high-rise and an atrium building, linked by a connecting block, plus a former exhibition hall. The building is listed. The first step is preparing the initial project documentation (project stages 1 and 2a). Further project stages may be ordered in steps. No right to later stages is guaranteed. Work should start right after award.
SELinköping, Sweden8 days left
The buyer, Specialfastigheter Sverige AB, needs consultants for a specific construction project called KV Kalmar Syd. The contract is split into seven lots. Roles include deputy project manager, electrical installation manager, overall installation coordinator, construction manager, safety coordinator (BAS-U), lead fire consultant and handling fire consultant. Bidders can apply for one or more lots.
CZPraha, CzechiaNo deadline given
The buyer, Letiště Praha, wants a firm to act as construction site supervisor, health and safety coordinator and project manager for the APC car park building in Prague. The car park is being built under a design-and-build model, where the builder is responsible for both construction and design documentation. Full details are in the tender annexes, mainly Annex D. Negotiated procedure with a call.