CZHukvaldy, Czechia28 days left
The Hukvaldy municipality wants design documentation for a new public space on the Hukvaldský dvůr brownfield site. The scope covers green-blue infrastructure, street furniture, water features, permeable surfaces and rainwater management, based on a hydrogeological assessment. The space must be open to everyone. The work includes all planning and permits needed for the project, including representing the buyer in permit proceedings. The design must follow the Just Transition programme rules on environmental protection and climate resilience.
CZPraha, CzechiaNo deadline given
The buyer, Letiště Praha, wants a firm to act as construction site supervisor, health and safety coordinator and project manager for the APC car park building in Prague. The car park is being built under a design-and-build model, where the builder is responsible for both construction and design documentation. Full details are in the tender annexes, mainly Annex D. Negotiated procedure with a call.
CZHolešov, Czechia18 days left
The buyer, the town of Holešov, wants an energy services contract using the Energy Performance Contracting (EPC) method for its public street lighting. The contractor carries out the work turnkey, including supplies, installation and any civil works. It also handles commissioning, operating documents and staff training, and runs energy management until the end of 2037. The contractor guarantees a minimum energy saving, measured over the 2031 to 2037 accounting periods.
CZPraha, Czechia11 days left
The Road and Motorway Directorate of the Czech Republic wants a framework agreement for geotechnical survey services on small road construction projects. Work is ordered as individual call-offs from framework participants. Each call-off covers preliminary, detailed or supplementary ground surveys, ending in a final survey report prepared under TP76 by a responsible specialist.
ROTargu Mures, Romania9 days left
The buyer, a natural gas company's Targu Mures branch, wants services to recreate lost or damaged technical documentation for pressure vessels. The documents are needed so a contractor can carry out VTU I/E inspection and extend the remaining service life of the vessels. Some documents were damaged beyond recovery or are missing. Single lot. Open procedure.