CZHukvaldy, Czechia28 days left
The Hukvaldy municipality wants design documentation for a new public space on the Hukvaldský dvůr brownfield site. The scope covers green-blue infrastructure, street furniture, water features, permeable surfaces and rainwater management, based on a hydrogeological assessment. The space must be open to everyone. The work includes all planning and permits needed for the project, including representing the buyer in permit proceedings. The design must follow the Just Transition programme rules on environmental protection and climate resilience.
CZPardubice - Pardubice-Staré Město, Czechia32 days left
The buyer wants design documentation for a new dormitory building (DM) with a canteen (ŠJ) in the Ke Tvrzi area of Pardubice. The building is rectangular, with four floors. The ground floor holds staff rooms, a boiler room, laundry, storage, a server room and workshops. Upper floors have shared bedrooms, bathrooms, study and club rooms, a gym and a roof terrace. The contract also includes the designer's supervision during construction. It is one lot.
CZPraha, CzechiaNo deadline given
The buyer, Letiště Praha, wants a firm to act as construction site supervisor, health and safety coordinator and project manager for the APC car park building in Prague. The car park is being built under a design-and-build model, where the builder is responsible for both construction and design documentation. Full details are in the tender annexes, mainly Annex D. Negotiated procedure with a call.
CZPraha, Czechia11 days left
The Road and Motorway Directorate of the Czech Republic wants a framework agreement for geotechnical survey services on small road construction projects. Work is ordered as individual call-offs from framework participants. Each call-off covers preliminary, detailed or supplementary ground surveys, ending in a final survey report prepared under TP76 by a responsible specialist.
DEMünstertal, GermanyNo deadline given
The buyer, the municipality of Münstertal, wants general planning services for the third construction phase of the L123 road upgrade. Scope covers engineering structures, traffic facilities, and technical building equipment (building services group 4). The procedure is negotiated with a call, with one lot.