ROBucuresti, RomaniaNo deadline given
The buyer, the Romanian Ministry of Defence (military unit 02547), wants design and construction works for a real estate investment at barracks 3015 in Bucharest. The works cover construction and installations, so the General Staff of Defence can carry out its tasks safely. The work must follow national law and Ministry of Defence rules. The procedure is restricted and the notice is in Romanian.
ROBucuresti, Romania30 days left
The buyer, Spitalul Clinic Coltea, wants a combined design-and-build contract for Phase 1 of a hospital project in Bucharest. Scope covers technical-economic documentation at detailed design stage, designer technical assistance, construction works and supply of equipment. The works extend building C2 with interior and exterior changes, a new upper floor and façade renovation, and modify and relocate buildings C3 and C4. Open procedure.
ROBucuresti, Romania23 days left
The buyer wants a contractor to design and build the Pantelimon road junction (A0 km 48), A0 North sector, near Bucharest. The work follows the works contract terms. It is a single lot, procured through an open tender. Bidders may ask questions about the tender documents up to 25 days before the bid deadline. The buyer will answer all questions in one batch 12 days before the deadline.
ROBuftea, Romania17 days left
The buyer wants a contractor to design and build a new transport depot in Buftea, Ilfov County. Scope includes an administrative building, a repair workshop with car wash and inspection station, and a bus parking canopy. Works also cover paved areas, 24 parking spaces, fencing, and a rooftop solar system of at least 146.25 kWp. Ten overnight bus chargers, two 22 kW car chargers and an energy audit are included. Duration: 18 months (3 months design, 15 months construction).
ROBucuresti, Romania34 days left
Sector 3 city council in Bucharest wants a contractor to carry out construction works for the "Mihai Bravu Educational and Community Hub" investment project. The works aim to improve living conditions for Sector 3 residents. Works run for 16 months, from the start date set in the buyer's start order. The buyer requires a minimum warranty of 36 months after handover. Single lot, open procedure.