ROBucuresti, RomaniaConstruction works22 days left

Additional restoration works on the former Mihail Sturdza Palace in Iasi, Romania

Deadline 2026-11-25Value 75M RON

What they want

The buyer, the National Investment Company (CNI), wants a contractor for additional works on the former Mihail Sturdza Palace in Iasi. The project covers strengthening, restoration and conversion of a listed historical building at Closca street 9. The main investment works and site organisation are included. This is an open procedure for works.

Who it suits

Construction firms experienced in heritage building restoration, structural strengthening and historic masonry work, able to work on public contracts in Romania.

Keywords

historic building restorationstructural strengtheningheritage constructionIasi construction worksRomania public worksbuilding conversion

Original title

Executie Lucrari pentru obiectivului de investitii- “Consolidare, Restaurare și Refunctionalizare a Imobilului Fostul Palat Mihail Sturdza, situat în Municipiul Iași, str. Cloșca, nr. 9, M.I. cuprins în L.M.I. la poz. 954 cu nr. IS-II-m-B-03808, județul Iași”- lucrări suplimentare - ID 1669

Bid through the official notice

Documents, contact details and the way to submit a bid are in the official notice.

Read the official notice and bid →

Source: TED, © European Union (CC BY 4.0), and Find a Tender (UK, Open Government Licence v3.0). Summaries are written by AI and may contain mistakes: always check the official notice.

Similar open tenders

ROTimisoara, Romania35 days left

Repair and maintenance of public monuments in Timisoara, Romania

The buyer, Municipiul Timisoara, wants a framework agreement for repair and maintenance works on public monuments it manages in Timisoara. Work will be ordered through later call-off contracts, following the requirements in the tender documents. Open procedure, single default lot. The buyer will answer clarification questions if they are submitted at least 22 days before the deadline.

Construction worksBuyer Municipiul TimisoaraValue 3.2M RONDeadline 2026-12-08
ROOradea, Romania38 days left

District-heating pipe design and construction in Oradea, Romania

The buyer, Municipiul Oradea, wants a contractor to design and build district-heating network works in Oradea. The project links and modernises primary heating pipes on Strada Eroului Necunoscut, Strada Pacii and Strada Rozmarinului. Goals are better heat comfort for customers and lower energy production and consumption costs. The works are procured as one lot through an open procedure.

Construction worksBuyer MUNICIPIUL ORADEAValue 3.9M RONDeadline 2026-12-11
ROHunedoara, Romania23 days left

Energy-efficiency works on a residential block in Hunedoara, Romania

The buyer, Municipiul Hunedoara, wants a contractor for energy-efficiency retrofit works on a 1974 residential block at Str. Viorele 2, Block 11, Hunedoara. The project is co-funded under the Regional Vest 2021-2027 programme. Works follow the technical design and building permit provided in the tender documents. The notice is a single lot with an open procedure.

Construction worksBuyer Municipiul HunedoaraValue 6.4M RONDeadline 2026-11-26
ROSimeria, Romania22 days left

Energy-efficiency renovation of four apartment blocks in Simeria, Romania

The buyer wants a contractor to carry out energy-efficiency renovation works on four multi-family residential blocks in Simeria: Piata Unirii blocks 18, 20 and 21, and Teilor street block 19. The works include all main, secondary and ancillary tasks needed for a complete, fully working result, built to the technical project. The contract lasts up to 8 months. At least 3 blocks must be worked on in parallel.

Construction worksBuyer ORASUL SIMERIAValue 17.8M RONDeadline 2026-11-25
ROSimeria, Romania20 days left

Energy-efficiency renovation of six apartment blocks in Simeria, Romania

The buyer wants a contractor to carry out energy-efficiency renovation works on six multi-family residential blocks in Simeria, Romania. The works cover all main, secondary and auxiliary tasks needed to complete the project and put it into use, following the technical design. The contract lasts a maximum of 8 months. Work will run in parallel on three blocks at a time. This is a single lot, under an open procedure.

Construction worksBuyer ORASUL SIMERIAValue 18.7M RONDeadline 2026-11-23