ROGalati, Romania28 days left
The buyer, Galati County Council, wants a renewable energy production system for Targu Bujor town hospital. The contract covers technical design, permit documentation, execution drawings, designer technical assistance, technical checking, and construction and installation works. It is one lot, tendered by open procedure. The design services and the works are estimated in the notice.
ROUricani, Romania35 days left
The buyer, Uricani town hall, wants a contractor to carry out energy efficiency works on Block 2, Strada Muncii, in Uricani, Hunedoara County. The building has five storeys above ground, 54 two-room flats and ground-floor shops. It is funded by a regional EU programme. The work is a single lot. Bidders may ask questions before the deadline; the buyer will answer them.
RODumbravita, Romania20 days left
The buyer, Dumbravita commune, wants a new school building for primary and lower-secondary pupils in Dumbravita, Timis County. The project aims to ease overcrowding in existing schools and meet current safety, accessibility and equipment standards. Scope includes construction works, installations, functional equipment fitted on site, and site organisation. This is a single lot, works contract, awarded by open procedure.
ROSibiu, Romania46 days left
The buyer, Municipiul Sibiu, wants a contractor to carry out road modernisation works on Rahovei Street in Sibiu. This is a single works contract under an open procedure, with one lot. The contract runs for up to 12 months. The buyer issues the start order within 1 month of signing. Works take 9 months from the start order. Final acceptance follows within 2 months of the completion notice.
ROFocsani, Romania21 days left
The buyer wants a contractor to design and build a new accommodation pavilion at military barracks 329 Boboc in Focsani, Romania. The work covers design, permits and approvals, technical checks, detailed execution drawings, construction and installation, plus the designer's technical support during works. Single lot, open procedure. Design takes 90 calendar days; construction takes 640 calendar days. Guarantee of at least 60 months after handover.