ROBucuresti, RomaniaConstruction works32 days left

Design, building works and equipment for a cell therapy centre in Bucharest, Romania

Deadline 2026-12-07Value 51.4M RON

Log in to save this tender or create a free account

What they want

The buyer, Institutul Clinic Fundeni, wants a contractor to convert an existing building (block C3) into an advanced cell therapy research and production centre. The contract covers design, construction works, and technical assistance from the designer during construction. It also includes supplying, installing, commissioning and testing medical equipment. Equipment includes cryogenic storage, safety and monitoring systems, cell processing and quality control units, and microbiological testing devices. Single lot.

Who it suits

Construction firms with hospital or laboratory fit-out experience, design companies, and medical or laboratory equipment suppliers able to install and commission equipment.

Good to know

  • Works are awarded as one lot, covering design, construction and equipment together

Keywords

construction worksbuilding refurbishmenthospital fit-outlaboratory equipmentcell therapy facilitydesign and buildBucharest

Original title

Proiectare, execuţie lucrări și asistenţă tehnică din partea proiectantului pentru obiectivul de investitii: “Amenajare centru de cercetare producție ATMP Hub Terapie celulară avansată (Nextgen) Refuncționalizare clădire existentă corp C3 Institutul Clinic Fundeni”

Bid through the official notice

Documents, contact details and the way to submit a bid are in the official notice.

Read the official notice and bid →

Source: TED, © European Union (CC BY 4.0), and Find a Tender (UK, Open Government Licence v3.0). Summaries are written by AI and may contain mistakes: always check the official notice.

Similar open tenders

ROBucuresti, RomaniaNo deadline given

Design and construction works for a military barracks in Bucharest, Romania

The Romanian Ministry of National Defence (military unit 02547) wants design and build works for a real estate investment at barracks 3015 in Bucharest. The works cover construction and installations to improve facilities for the Defence General Staff. It is a single lot, procured by restricted procedure.

Construction worksBuyer MINISTERUL APARARII - UNITATEA MILITARA 02547 BUCURESTIValue 44.6M RON
ROBucuresti, RomaniaNo deadline given

Design and construction works for a military base building in Bucharest, Romania

The buyer, the Romanian Ministry of Defence (military unit 02547), wants design and construction works for a real estate investment at barracks 3015 in Bucharest. The works cover construction and installations, so the General Staff of Defence can carry out its tasks safely. The work must follow national law and Ministry of Defence rules. The procedure is restricted and the notice is in Romanian.

Construction worksBuyer MINISTERUL APARARII - UNITATEA MILITARA 02547 BUCURESTIValue 44.6M RON
ROFocsani, Romania21 days left

Design and build of a new accommodation building at Boboc barracks, Focsani, Romania

The buyer wants a contractor to design and build a new accommodation pavilion at military barracks 329 Boboc in Focsani, Romania. The work covers design, permits and approvals, technical checks, detailed execution drawings, construction and installation, plus the designer's technical support during works. Single lot, open procedure. Design takes 90 calendar days; construction takes 640 calendar days. Guarantee of at least 60 months after handover.

Construction worksBuyer MINISTERUL APARARII - UNITATEA MILITARA 02542 FOCSANIValue 60.5M RONDeadline 2026-11-26
ROBucuresti, Romania18 days left

Design, technical assistance and construction of a school complex in Bucharest, Romania

The buyer, Sector 1 of Bucharest, wants a company to design and build a multifunctional educational complex in the Henri Coandă district. It includes a school, a kindergarten, and a sports hall with swimming pool, plus green spaces, a multisport area, playgrounds and paths. The plot is about 16,797 sq m. Design takes up to 8 months; works take up to 36 months. Minimum contract length is 80 months. Warranty is at least 36 months.

Construction worksBuyer Sector 1 (Sectorul 1 al municipiului Bucuresti)Value 157.4M RONDeadline 2026-11-23
ROBucuresti, Romania28 days left

Hospital building extension, design and works in Bucharest, Romania

The buyer, Spitalul Clinic Coltea, wants a combined design-and-build contract for Phase 1 of a hospital project in Bucharest. Scope covers technical-economic documentation at detailed design stage, designer technical assistance, construction works and supply of equipment. The works extend building C2 with interior and exterior changes, a new upper floor and façade renovation, and modify and relocate buildings C3 and C4. Open procedure.

Construction worksBuyer SPITALUL CLINIC COLTEAValue 100M RONDeadline 2026-12-03

More from INSTITUTUL CLINIC FUNDENI: open tenders and who won before →