SKSvätý Anton, Slovakia7 days left
The buyer wants construction, restoration and artisan works on the Svätý Anton manor house, which houses a museum and is a listed national cultural monument. The site is in Banská Štiavnica district. Work covers selected parts of the building. Detailed scope is set out in the bill of quantities, restoration research and project documentation attached to the tender. This is a single-lot open procedure for works.
SKBanská Bystrica, Slovakia21 days left
The buyer, Banskobystrický samosprávny kraj, wants construction works to modernise practical training facilities at a vocational secondary school in Banská Bystrica. Work includes building and upgrading a practical training workshop, a sheep barn, a beehive workshop, an aviary and a retention roof. The project aims to improve practical training for pupils. Full details are in the tender documents.
SKBanská Bystrica, Slovakia31 days left
The buyer, state forest enterprise LESY Slovenskej republiky, wants construction works to restore and add water retention measures in forest areas. The work covers 124 projects in total, spread over three lots: western Slovakia (29 projects), central Slovakia (47) and eastern Slovakia (48). Tasks include repairing road drainage, culverts, infiltration pits and ditches, and erosion control.
SKKošice, Slovakia32 days left
The buyer wants a 1,672 m water supply main rebuilt between Viničky and Ladmovce, outside built-up areas, on the right bank of the Bodrog stream. Most of the pipe is 500 mm ductile iron (1,645 m). A 27 m section under the Bodrog flood embankment gets an inserted HDPE pipe. Works include open-trench laying, pressure tests, flushing, disinfection and site reinstatement. Work is phased to keep supply running.
SKSliač, Slovakia6 days left
The buyer, Kúpele Sliač spa operator, wants a general contractor to reconstruct parts of the protected KH Palace building and add a new pool hall extension. The work creates wellness and balneotherapy facilities, including technology systems. Scope covers finishing design documents, coordinating all trades, construction, installing and commissioning wellness technology, complex testing, and as-built documentation. The building is a national cultural monument, so all work must respect its heritage value. Single contract, works, open procedure.