ROIasi, Romania10 days left
The buyer wants design and construction work to improve energy efficiency in 7 administrative buildings of the Iasi Border Police. Scope covers the technical design phase and building works, aimed at cutting energy use and improving building operation. The contract is split into 7 lots, one per building, at sites in Iasi, Albita, Vaslui, Berezeni, Botosani and Stanca. Funded by an EU regional programme and the state budget.
ROOradea, Romania35 days left
The buyer, Municipiul Oradea, wants a contractor to design and build district-heating network works in Oradea. The project links and modernises primary heating pipes on Strada Eroului Necunoscut, Strada Pacii and Strada Rozmarinului. Goals are better heat comfort for customers and lower energy production and consumption costs. The works are procured as one lot through an open procedure.
ROTargu Mures, Romania38 days left
The buyer, Targu Mures City Hall, wants energy efficiency works on apartment blocks under Romanian Emergency Ordinance 18/2009. This is Lot 1 of a four-lot tender covering 24 blocks in total. Lot 1 covers 6 blocks on several streets in Targu Mures, including 1 Decembrie 1918 Boulevard and Parangului Street.
ROBuzau, Romania10 days left
The buyer wants design and construction works to stabilise slopes along national road DN 10 near Buzau, Romania. Work covers two road sections, km 79+530 to km 79+805 and km 84+190 to km 84+330, on the right side. The aim is to reduce slope instability and stop rocks and boulders falling onto the road. The contract includes technical design, site supervision, technical verification and execution of the works.
ROFocsani, Romania20 days left
The buyer wants a contractor to design and build a new accommodation pavilion at military barracks 329 Boboc in Focsani, Romania. The work covers design, permits and approvals, technical checks, detailed execution drawings, construction and installation, plus the designer's technical support during works. Single lot, open procedure. Design takes 90 calendar days; construction takes 640 calendar days. Guarantee of at least 60 months after handover.