ROCluj-Napoca, Romania22 days left
The buyer, the Avram Iancu International Airport in Cluj-Napoca, wants a contractor to design and build the "Amenajare parcare EST" car park project. It is a works contract under the sector rules, awarded by open procedure. The full work description is in the tender specifications. Clarification questions go through the SEAP electronic system; the buyer will answer in two rounds before the bid deadline.
ROBuzau, Romania6 days left
The buyer wants design and construction works to stabilise slopes along national road DN 10 near Buzau, Romania. Work covers two road sections, km 79+530 to km 79+805 and km 84+190 to km 84+330, on the right side. The aim is to reduce slope instability and stop rocks and boulders falling onto the road. The contract includes technical design, site supervision, technical verification and execution of the works.
ROSibiu, Romania41 days left
The buyer, Municipiul Sibiu, wants a contractor to carry out road modernisation works on Rahovei Street in Sibiu. This is a single works contract under an open procedure, with one lot. The contract runs for up to 12 months. The buyer issues the start order within 1 month of signing. Works take 9 months from the start order. Final acceptance follows within 2 months of the completion notice.
ROGiurgiu, Romania24 days left
The buyer, APA SERVICE SA, wants a contractor to design and build a wastewater treatment plant at Ogrezeni, near Giurgiu, Romania. The contract covers design, construction works, and technical assistance from the designer, as set out in the tender specifications. It is one lot, awarded through an open procedure.
ROBrasov, Romania13 days left
The buyer wants a contractor to design and rebuild a road bridge over the Timisul Sec stream and the railway track group at Triaj, on Strada Timisul Sec in Brasov. The work follows an approved technical solution. The scope covers design documents, bridge reconstruction works, and the designer's technical assistance during construction. Design takes 3 months; construction takes 20 months, with designer support during that time.