ROCalarasi, Romania16 days left
The buyer, ECOAQUA SA, wants a contractor to design and build water supply works in Calarasi county, Romania, under a regional water infrastructure project. Scope includes the detailed technical design and permit documents, designer technical assistance, operating permit paperwork, and construction in seven sectors: transport pipes, water supply systems in Lehliu Gara, Dor Marunt, Lupsanu, Ulmu and Dorobantu, and a wastewater pumping station with rising main. Full details are in the specifications.
ROCluj-Napoca, Romania22 days left
The buyer, the Avram Iancu International Airport in Cluj-Napoca, wants a contractor to design and build the "Amenajare parcare EST" car park project. It is a works contract under the sector rules, awarded by open procedure. The full work description is in the tender specifications. Clarification questions go through the SEAP electronic system; the buyer will answer in two rounds before the bid deadline.
RODudu, Romania31 days left
The buyer wants a framework agreement for upgrading and repairing 29 streets in Chiajna commune, Ilfov County. Streets are unpaved or damaged. The work covers technical design documents, construction, and the designer's technical assistance during construction. Delivery follows three stages: permits and design, construction, then site assistance until handover. Call-off contracts will be awarded under the framework.
ROGiurgiu, Romania24 days left
The buyer, APA SERVICE SA, wants a contractor to design and build a wastewater treatment plant at Ogrezeni, near Giurgiu, Romania. The contract covers design, construction works, and technical assistance from the designer, as set out in the tender specifications. It is one lot, awarded through an open procedure.
ROBrasov, Romania13 days left
The buyer wants a contractor to design and rebuild a road bridge over the Timisul Sec stream and the railway track group at Triaj, on Strada Timisul Sec in Brasov. The work follows an approved technical solution. The scope covers design documents, bridge reconstruction works, and the designer's technical assistance during construction. Design takes 3 months; construction takes 20 months, with designer support during that time.