ROMoreni, Romania26 days left
The buyer wants a contractor to carry out construction works for its sustainable urban mobility project in Moreni. Scope includes roads, public transport stops, an integrated e-ticketing system, smart traffic management, bus priority, video monitoring, a dispatch centre, pedestrian zones and a bus depot. Minimum results: upgrade 11 streets in 14 sections, build 65 public transport stops, five pedestrian zones and a depot with solar power and six charging points. Supply and installation of equipment is included. Electric buses are excluded.
ROBuzau, Romania10 days left
The buyer wants design and construction works to stabilise slopes along national road DN 10 near Buzau, Romania. Work covers two road sections, km 79+530 to km 79+805 and km 84+190 to km 84+330, on the right side. The aim is to reduce slope instability and stop rocks and boulders falling onto the road. The contract includes technical design, site supervision, technical verification and execution of the works.
ROCraiova, Romania19 days left
The buyer wants a contractor to carry out the full construction works to modernise national road DN 56C, from km 0+000 to km 60+375, near Craiova, Romania. The goal is safer, more comfortable road travel. The contractor must supply all materials, machinery and equipment, transport them to site, run required tests, set up and clear the site, and prepare quality and construction documentation. Single lot.
ROSibiu, Romania45 days left
The buyer, Municipiul Sibiu, wants a contractor to carry out road modernisation works on Rahovei Street in Sibiu. This is a single works contract under an open procedure, with one lot. The contract runs for up to 12 months. The buyer issues the start order within 1 month of signing. Works take 9 months from the start order. Final acceptance follows within 2 months of the completion notice.
ROValcelele, Romania13 days left
The buyer, Comuna Vâlcelele, wants construction works to build a smart natural gas supply network in Vâlcelele commune, including the villages Vâlcelele and Floroaica, Călărași County. The works form one investment and will be carried out in two stages. Stage 1 has secured funding. Stage 2 depends on funding being secured first, as set out in the tender documents and contract.