ROMoreni, RomaniaConstruction works26 days left

Road, bus stop and smart traffic works for urban mobility project in Moreni, Romania

Deadline 2026-12-02Value 49.9M RON

Log in to save this tender or create a free account

What they want

The buyer wants a contractor to carry out construction works for its sustainable urban mobility project in Moreni. Scope includes roads, public transport stops, an integrated e-ticketing system, smart traffic management, bus priority, video monitoring, a dispatch centre, pedestrian zones and a bus depot. Minimum results: upgrade 11 streets in 14 sections, build 65 public transport stops, five pedestrian zones and a depot with solar power and six charging points. Supply and installation of equipment is included. Electric buses are excluded.

Who it suits

Road construction firms, civil contractors, and electrical and intelligent transport systems installers able to work on a large public project.

Good to know

  • Electric buses are not part of this contract; the contractor only coordinates interfaces with them and tests them.
  • Questions can be submitted up to 18 days before the bid deadline; the buyer answers 10 days before it.

Keywords

road constructionbus stopspublic transportintelligent traffic systemse-ticketingpedestrian zonesbus depotMoreni

Original title

EXECUTIE LUCRARI PENTRU OBIECTIVUL DE INVESTITII „PROMOVAREA MOBILITATII URBANE SUSTENABILE IN MUNICIPIUL MORENI” Cod SMIS 340995

Bid through the official notice

Documents, contact details and the way to submit a bid are in the official notice.

Read the official notice and bid →

Source: TED, © European Union (CC BY 4.0), and Find a Tender (UK, Open Government Licence v3.0). Summaries are written by AI and may contain mistakes: always check the official notice.

Similar open tenders

ROBuzau, Romania10 days left

Slope stabilisation works on national road DN 10 near Buzau, Romania

The buyer wants design and construction works to stabilise slopes along national road DN 10 near Buzau, Romania. Work covers two road sections, km 79+530 to km 79+805 and km 84+190 to km 84+330, on the right side. The aim is to reduce slope instability and stop rocks and boulders falling onto the road. The contract includes technical design, site supervision, technical verification and execution of the works.

Construction worksBuyer COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A.Value 77.6M RONDeadline 2026-11-16
ROPloiesti, Romania39 days left

Road modernisation works, Azuga–Busteni–Gura Vitioarei route, Prahova, Romania

The buyer wants a contractor to carry out road modernisation, rehabilitation and extension works on the Azuga - Busteni - Gura Vitioarei route in Prahova county, Romania. This tender covers section 1, Gura Vitioarei to Valea Doftanei. Works include new road structure, shoulders, storm drainage, bridges, strengthening, railway works, outdoor lighting and relocation of utility networks. A site visit date will be published later.

Construction worksBuyer CONSILIUL JUDETUL PRAHOVA, DIRECTIA SERVICII SI ACHIZITII PUBLICEValue 288.7M RONDeadline 2026-12-15
ROChitila, Romania5 days left

Design, site supervision and construction of an electric bus depot in Chitila, Romania

The buyer wants design services, designer technical assistance during construction, and construction works for an electric bus depot in Chitila, Ilfov County. The depot will house, maintain and operate at least 21 electric buses. Scope includes a dispatch building, parking areas, technical zones, a washing facility and inspection ramps. The project is EU-funded and linked to the buyer's purchase of electric buses.

Construction worksBuyer ORASUL CHITILA (CONSILIUL LOCAL CHITILA)Value 26.3M RONDeadline 2026-11-11
ROSibiu, Romania45 days left

Road modernisation works on Rahovei Street in Sibiu, Romania

The buyer, Municipiul Sibiu, wants a contractor to carry out road modernisation works on Rahovei Street in Sibiu. This is a single works contract under an open procedure, with one lot. The contract runs for up to 12 months. The buyer issues the start order within 1 month of signing. Works take 9 months from the start order. Final acceptance follows within 2 months of the completion notice.

Construction worksBuyer Municipiul SibiuValue 27.7M RONDeadline 2026-12-21
ROTimisoara, Romania38 days left

Design and build of a road overpass in Timisoara, Romania

The buyer wants a company to design and build a grade-separated road overpass (pasaj denivelat). It sits on DC 152 (formerly DC 98), Calea Urseni, at the junction with the Timisoara Sud bypass. The contract is for works under an open tender procedure, with a single lot.

Construction worksBuyer COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A.Value 70.3M RONDeadline 2026-12-14

More from MUNICIPIUL MORENI: open tenders and who won before →