ROBucuresti, Romania16 days left
The buyer wants a contractor to design and carry out works for the Sălaj Tribunal and Zalău Court building: capital repair, modernisation, thermal rehabilitation and extension. The site is on Tudor Vladimirescu street, Zalău. The contract covers design, construction works and technical assistance from the designer. It is a single lot, and the remaining works are still to be executed.
ROIasi, Romania24 days left
The buyer wants design and construction work to improve energy efficiency and cut energy use in seven administrative buildings of the Iasi Border Police. The work covers the technical design phase and the building works. It is split into seven lots, one per building, at sites in Iasi, Albita, Vaslui, Berezeni, Botosani and Stanca. Funding comes from an EU regional programme and the state budget.
ROCluj-Napoca, Romania22 days left
The buyer, the Avram Iancu International Airport in Cluj-Napoca, wants a contractor to design and build the "Amenajare parcare EST" car park project. It is a works contract under the sector rules, awarded by open procedure. The full work description is in the tender specifications. Clarification questions go through the SEAP electronic system; the buyer will answer in two rounds before the bid deadline.
ROBaia Mare, Romania35 days left
The buyer wants design and build works to rehabilitate the Teleki Castle complex in Pribilesti, Maramures County, Romania. The castle is a listed historic monument. It will become a multifunctional socio-cultural centre for cultural, artistic, recreational and educational activities. The works are split into two lots: Lot 1 covers the castle building (C1), including utility connections. Lot 2 covers the annex building (C2), its works, utility connections and exterior landscaping.
RODudu, Romania31 days left
The buyer wants a framework agreement for upgrading and repairing 29 streets in Chiajna commune, Ilfov County. Streets are unpaved or damaged. The work covers technical design documents, construction, and the designer's technical assistance during construction. Delivery follows three stages: permits and design, construction, then site assistance until handover. Call-off contracts will be awarded under the framework.